Logo
A non-profit community theater      10 New England Avenue, Summit, NJ 07901      908-273-2192


Home

Volunteers
Needed!


Current Show

Online
Ticketing


Tickets  &
Subscriptions


2011 - 2012
Season


Kaleidoscope
Theatre


Playhouse on Facebook Facebook

Past Shows

Photo
Galleries


Past
Playbills


Maps  &
Directions


2011 - 2012
Calendar


Behind The
Scenes


Accessibility
Services


Join Us

Contact Us

Links

Spacer
Images: New pictures at end
IMG_0084.jpg
July 31: The trees are down, and the excavation between the lobby and the old part of the building is complete.

IMG_0075.jpg
July 31: The space between the lobby and the stage, after excavation. The lobby is on the left, the auditorium is in the back, and the stage is on the right.

IMG_0077.jpg
July 31: Detail of the excavation between the lobby and the stage. You can see the foundation for the new lift and restroom.

IMG_0081.jpg
July 31: The former costume closet (lower level). They've striped the back wall down to the foundation, and they've started to cut through the foundation for the lift entrance.

DSCN1322.jpg
Aug. 4: They've started to build the foundation for the lift housing and the new restroom.

IMG_0096.jpg
Aug. 9: The new walls are up! The opening in the middle will be the exterior, ground-level entrance to the lift.

Page: 1 2 3 4 5 6
 

Made with Extensis Portfolio


www.SummitPlayhouse.org

09:55 EDT Apr 02, 2012

Email comments to
webmaster@SummitPlayhouse.org
Copyright © The Playhouse Association, Inc., 2012.
All scheduled productions are subject to availability.